godale03
Awesomer!! Than Rolex!!
Supporter
Well the basement is coming along finally. In about two months time they have framed and drywalled, roughed in plumbing and electric, and the fireplace is in. We have picked out the cabinets for the bar, as well as all the flooring all picked out and ordered. The best part is that the 45" LCD has been purchased and ready to rock. My buddy and I ran all the low voltage.... Telephone, TV, and Network to everyroom and in a few places in the theater area. Hopefully in the next month or two we will be all set and ready for the opening kick for the Skins. I hope to have some pictures posted of the progress soon. Take care guys.
Tom
P.S.
Hey Fast Ed.... do you have a line on a distributor for the Gorilla Rack benches? There is nowhere here in MD that sells them. Thanks man
Tom
P.S.
Hey Fast Ed.... do you have a line on a distributor for the Gorilla Rack benches? There is nowhere here in MD that sells them. Thanks man